SAFETY WATCH: Take A Closer Look at Your Quick Coupler

Not So Fast…Before You Attach a Bucket to Your Excavator, Take A Closer Look at Your Quick Coupler

THE ACCIDENT:

During a water main installation, a crew member entered a newly dug lateral excavation, preparing to install a pipe. Using a quick coupler, an excavator operator changed buckets and swung the machine over to the trench to continue digging on the main line. The bucket detached and fell into the excavation, killing the man in the trench.

THE BOTTOM LINE:

While quick couplers allow instant attachment changes, users should always inspect them to ensure they have been properly engaged and locked prior to use. Since 2010, at least 15 accidents involving unexpected bucket release from quick couplers occurred, with eight resulting in fatalities, in the United States alone. As a result, most quick coupler manufacturers now provide retrofit locking pins, which insert behind the coupler’s front or rear levers to avert unintended release. Other manufacturers offer newly designed coupler systems and include safe use instructions and operating procedures. Despite these procedures being put in place, unintended bucket releases continue to happen. Two reasons: Not all workers who use quick couplers realise the risk or they continue to use older coupler models, not knowing of the manufacturers’ corrective actions. Often, users fail to retrofit with locking pins, while others lack adequate installation or inspection training.

In the meantime, protect yourself and your co-workers by:

  • Securely latching attachments before work begins
  • Thoroughly inspecting all quick couplers for unexpected release hazards, such as older couplers requiring locking pins or another retrofit method.
  • Choosing newer quick coupler models specifically created to prevent unintended attachment release.
  • Asking for and installing manufacturer recommended retrofits when necessary, such as positive locking pins or other manually installed devices.
  • Using a manual or automatic independent secondary system to prevent bucket slippage, in the event of a primary system failure. Also, make sure the secondary system includes an attachment verification procedure.
  • Following quick coupler maintenance and inspection procedures per the manufacturers’ recommendations to prevent a malfunction.
  • Making sure you do visual and operational inspections on all machine components and controls before operating the machine.

Credit: Equipment World

Need an instant and detailed quote? GET A QUOTE or call:

NORTH ISLAND: 09 320 5188 (Auckland)

SOUTH ISLAND: 03 543 9030 (Nelson)

OUR MISSION

MAINLINE TRACK BRING EXCAVATOR ATTACHMENTS & WEARING PARTS DIRECT FROM THE FACTORY TO THE OPERATOR SUPPLIED FROM STOCK AND OF AN UNCOMPROMISED QUALITY

NEED HELP?

NEED HELP FINDING A PART?
CONTACT OUR FRIENDLY SALES TEAM:

0800 551 201

Email Us

OUR PROMISE TO YOU

OUR 5 PROMISE CHARTER TO DELIVERING EXCEPTIONAL CUSTOMER SERVICE.

Read Charter